On our future status we will embark on,
A 1000hp truck mounted rig.
One test barge with a complete set of surface test equipments ,including a multi phase test metre
Two slick line operations with10kpsi pressure control equipments
Downhole memory gauges.
Electrical submersible and horizontal pumps ;installation and maintenance.
Christmass tree installation and maintenance units.
